Tenders and Contracts

ASD

Architectural Services Department

Refurbishment of Wa Hing Lane Public Toilet and Bathhouse, Sheung Wan, Hong Kong

Refurbishment of Sports Playing Surfaces at Soccer Pitch cum Rugby Pitch at Tin Yip Road Park, Tin Shui Wai, New Territories

Design and construction of light public housing at Olympic Avenue, Kai Tak

Design and construction of light public housing at Yau Pok Road, Yuen Long, at Tuen Mun Area 3A and at Choi Hing Road, Ngau Tau Kok

Design and construction of reprovisioning of Kong Wan Fire Station

Improvement Works to Old Teaching Block at Hong Kong Police College, Wong Chuk Hang, Hong Kong

Refurbishment to Toilets and Resting Area at Hong Kong Museum of History, Tsim Sha Tsui, Kowloon

Refurbishment to Parkes Street Refuse Collection Point, Yau Ma Tei, Kowloon

Term contract for the design and construction of minor works to government and subvented properties for which the Architectural Services Department is responsible for the Government of the Hong Kong Special Administrative Region [Contract area: Hong Kong Island, Lantau Island and Outlying Islands (South)]

Term contract for the maintenance of slopes for which the Architectural Services Department (Property Services Branch) is responsible [Designated contract area: New Territories and Outlying Islands (North)]

Construction of Quarry Park in Anderson Road Quarry

Design and construction of joint-user complex at Site G2, Anderson Road Quarry

Construction of joint-user complex at Texaco Road, Tsuen Wan

Construction of New Territories East Cultural Centre in Area 11, Fanling

Design and construction of open space with public vehicle park at Yen Chow Street West, Sham Shui Po

Reprovisioning of Victoria Public Mortuary

The works include the construction of a new public mortuary to provide five cold rooms, one deep freezer, four autopsy suites, functional facilities including X-ray and Computed Tomography Scan rooms, laboratories, body identification areas, interview rooms, facilities for bereavement services, autopsy viewing rooms, gowning cum de-gowning rooms and office, etc.; and a body storage area in the existing underground cavern, together with associated site formation and geotechnical works, piled foundation, building services installations, drainage and external works. The construction floor area is approximately 11,700 square metres. The contract is scheduled to commence in August 2025 and for completion in August 2028.

Construction of a 30-classroom Primary School at Area 89 (Northern Side), Tung Chung

The works include the construction of a 30-classroom primary school comprising a 7-storey classroom block with an assembly hall and associated facilities, together with building services installations, drainage and external works. The construction floor area is about 13,400 square metres. The contract is scheduled to commence in August 2024 and for completion in December 2026.

Construction of Activity Centre in Kowloon Park

The works include construction of an activity centre in Kowloon Park, together with historic preservation of the existing 2-storey former Whitfield Barrack, associated building services installations, drainage, external works and road improvement works. The construction floor area is approximately 2,870 square metres and the site area is approximately 6,090 square metres. The contract is scheduled to commence in July 2024 and for completion in July 2026.

Reprovisioning of Cremators and Related Works at Kwai Chung Crematorium

The works include the reprovisioning of 4 cremators and related renovation works together with associated building services installations, drainage and external works. The site is at Kwai Chung Crematorium. The construction floor area is approximately 3,900 square metres and the site area is approximately 3,200 square metres. The contract is scheduled to commence in August 2024 and for completion in March 2027.

Construction of a New Public Market in Kwu Tung North New Development Area

The works include the construction of a new public market together with associated building services installations, drainage and external works. The site is at Area 19 East of Kwu Tung North New Development Area. The construction floor area is approximately 14,400 square metres and the site area is approximately 5,500 square metres. The contract is scheduled to commence in July 2024 and for completion in April 2027.

Term Contract for the Design and Construction of Fitting-out Works to Buildings and Lands and Other Properties for which the Architectural Services Department is Responsible [Designated Contract Area: Hong Kong Island and Outlying Islands]

The works include the design and construction of fitting-out works to buildings and lands and other properties for which the Architectural Services Department is responsible in the Designated Contract Area of Hong Kong Island and Outlying Islands. The value of fitting-out works under each Works Order normally does not exceed a value of $50.0 million. The contract is scheduled to commence in July 2024 and the contract period is 48 months.

Construction of Public Open Space at Celebration Precinct, Wan Chai

The works include the construction of a public open space at Celebration Precinct, Wan Chai, comprising a continuous pedestrian waterfront promenade, landscaped areas, viewing platform and other ancillary facilities, together with associated building services installations, drainage and external works and addition and alteration works to existing facilities. The site area is approximately 18,000 square metres. The contract is scheduled to commence in July 2024 and for completion in September 2026.

Design and Construction of Hoi Ting Road Joint User Complex

The works include design and construction of a joint user complex accommodating a sport centre, an indoor heated swimming pool, a small library, a standard community hall, a maternal and child health centre, a public vehicle park and canopy along the building façade at Hoi Ting Road, together with associated building services installations, drainage and external works. The total net operational floor area is approximately 10,530 square metres and the site area is approximately 6,480 square metres. The contract is scheduled to commence in July 2024 and for completion in October 2027.

Design and Construction of Light Public Housing at Lok On Pai, Siu Lam

The works include design and construction of light public housing at Lok On Pai, Siu Lam. A total of 4,200 residential units for the works are to be provided with ancillary facilities and associated building services installations, drainage and external works. The contract is scheduled to commence in March 2024 and for completion in March 2026.

Design and Construction of Light Public Housing at Tuen Mun Area 54 and at Sheung On Street / Sheung Ping Street, Chai Wan

The works include design and construction of light public housing at Tuen Mun Area 54 and at Sheung On Street / Sheung Ping Street, Chai Wan. A total of 7,330 residential units for the works are to be provided with ancillary facilities and associated building services installations, drainage and external works. The contract is scheduled to commence in March 2024 and for completion in March 2026.

CEDD

Civil Engineering and Development Department

Provision of General Worker Services to the Civil Engineering and Development Building at 101 Princess Margaret Road, Kowloon, Hong Kong

The Contractor shall provide General Worker Services at the premises of the Civil Engineering and Development Building. The Contract would last for 36 months and is to be commenced on 15 March 2024, or a later date as specified by the Government.

Landslip Prevention and Mitigation Programme, 2021, Package G, Ground Investigation for Landslip Prevention and Mitigation Works

The works mainly comprise ground investigation and laboratory testing on soil and rock samples obtained from the ground investigation works for some 18 government slopes and retaining wall and some 24 natural hillside catchments in Kowloon and the New Territories. The works are scheduled to commence in March 2024 and will take about 30 months to complete.

Landslip Prevention and Mitigation Programme, 2020, Package F, Landslip Prevention and Mitigation Works

The works mainly comprise upgrading of some 28 government slopes and retaining walls and reconditioning works to some 8 existing government steel flexible barriers in Hong Kong Island, Kowloon and the New Territories. The works are scheduled to commence in February 2024 and will take about 42 months to complete.

Lift and Pedestrian Walkway System between Pik Wan Road and Lei Yue Mun Road, Yau Tong

The works mainly comprise construction of two pedestrian walkway systems including three lift towers, three footbridges and a footpath connecting Pik Wan Road, Ko Chiu Road and Lei Yue Mun Road, and associated civil works, geotechnical works, electrical and mechanical works, road works, drainage works and landscaping works. The works are scheduled to commence in the third quarter of 2023 and will take about 39 months to complete.

Tender for the Provision of Computer Software Licence Renewal to the Civil Engineering and Development Department

Item 1 – Provision of Renewal Architecture, Engineering and Construction Collection IC Commercial Single-user ELD Software License Annual Subscription

Ground Investigation - New Territories West

Land-based ground investigation term contract for various government projects for a period of 30 months commencing in December 2023.

Provision of Sanitary Facilities at Pak Kung Au, Lantau

The works include (1) construction of sanitary facilities with potable water and flushing water supply; (2) demolition of the existing barbecue site; (3) provision of hiking supporting facilities including shelters and sitting benches; and (4) carrying out associated civil, electrical and mechanical works, landscaping works, etc. The works are scheduled to commence in the fourth quarter of 2023 and will take about 24 months to complete.

Landslip Prevention and Mitigation Programme, 2020, Package C, Landslip Prevention and Mitigation Works

The works mainly comprise upgrading of some 28 government slopes and retaining walls and natural terrain hazard mitigation works to some 2 natural terrain study areas in Hong Kong Island, the New Territories and Outlying Islands. The works are scheduled to commence in February 2024 and will take about 42 months to complete.

Landslip Prevention and Mitigation Programme, 2021, Package D, Ground Investigation for Landslip Prevention and Mitigation Works

Provision of Quality Auditing Services on Off-site Prefabricated Steel Reinforcing Bar Products

The scope of services includes inspection, monitoring and auditing of the CEDD approved off-site steel prefabrication yard's operation and quality of prefabricated steel reinforcing bar products. There are currently five approved prefabrication yards located in Tsing Yi, Tai Po, Yuen Long and Tuen Mun areas. The contract is scheduled to commence tentatively on 1 December 2023 for completion in 24 months.

Landslip Prevention and Mitigation Programme, 2020, Package A, Landslip Prevention and Mitigation Works

The works mainly comprise upgrading of some 28 government slopes and retaining walls and natural terrain hazard mitigation works to some 3 natural hillside catchments in Kowloon, New Territories and Outlying Islands. The works are scheduled to commence in December 2023 and will take about 42 months to complete.

Provision of Security Guard Services at Government Explosive Depots and During Explosive Delivery

Provision of Security Guard Services at the Government Explosives Depots and During Explosive Delivery. The Contract will last for a period of 36 months and is to be commenced on 12 January 2024.

Ground Investigation Works for Development of the New Territories North

The works mainly comprise ground investigation works including drillholes, trial pits, groundwater monitoring, utility survey and associated in-situ and laboratory tests. The works are scheduled to commence in the third quarter of 2023 and will take about 18 months to complete.

Ground Investigation Works at Northern New Territories (North) (2023-25)

The ground investigation works mainly comprise vertical drillholes, trial pits, groundwater monitoring, utility survey and associated in-situ and laboratory tests. The works are scheduled to commence in September 2023 and will take about 18 months to complete.

Landslip Prevention and Mitigation Programme, 2020, Package D, Landslip Prevention and Mitigation Works

The works mainly comprise upgrading of some 28 government slopes and retaining walls and natural terrain hazard mitigation works to not less than 1 natural terrain study area in Hong Kong Island, Kowloon and the New Territories. The works are scheduled to commence in November 2023 and will take about 45 months to complete.

Site Formation and Infrastructure Works at Cheung Muk Tau

The works mainly comprise site formation works, construction of access road, road improvement works and the ancillary works including drainage, sewerage, waterworks and landscaping works. The works are scheduled to commence in the third quarter of 2023 and will take about 64 months to complete.

Provision of Soil and Rock Testing Services for the Public Works Laboratories – Urban and Marine (Term Contract)

The services include provision of testing services to soil and rock samples normally originated from Hong Kong Island, Ap Lei Chau, Kowloon and Hong Kong Territory Waters. The services are scheduled to commence in November 2023 and will take about 30 months to complete.

Ground Investigation Works for Yuen Long South Development Stages 2B and 3 Works

The works mainly comprise: Ground investigation works including drillholes, trial pits, groundwater monitoring, utility survey and associated in-situ and laboratory tests. The works are scheduled to commence in August 2023 and will take about 24 months to complete.

Revitalization of Lin Ma Hang Lead Mine Caves

The works include rock stabilization works for rock slope and rock cavern, drainage works and fencing works for shafts etc.. The works are scheduled to commence in April 2023 and will take about 28 months to complete.

CEDD Landscape Term Contract (2023 – 2027)

The works mainly comprise minor landscape works located throughout Hong Kong, including restricted areas and outlying islands. Works items include soil erosion control planting on natural hill slopes, amenity planting, horticultural maintenance, and other types of landscape works. The works are scheduled to commence in August 2023 with a 48-month contract period.

Site Formation and Infrastructure Works near Choi Shun Street, Sheung Shui

The works mainly comprise: 1. site formation; 2. construction of a section of carriageway, a lay-by and footpaths for connecting Choi Shun Street and Choi Fat Street; 3. road improvement works at Choi Fat Street and Choi Yuen Road; 4. construction of a footpath in the northeast of the site and the associated footpath shelter; and 5. ancillary works including drainage works, sewerage works, waterworks, land decontamination and landscaping works. The works are scheduled to commence in August 2023 and will take about 30 months to complete.

Ground Investigation - Marine Works

The works mainly include:- Marine ground investigation works including drillholes, in-situ testing and laboratory testing. The works are scheduled to commence in August 2023 and will take about 42 months to complete.

Provision of Services of a Community Liaison Team for Site Formation and Infrastructure Works for Public Housing Developments at San Hing Road and Hong Po Road, Tuen Mun

The Contract covers the provision of services of a Community Liaison Team for Site Formation and Infrastructure Works for Public Housing Developments at San Hing Road and Hong Po Road, Tuen Mun to enhance the understanding of the potential affectees about the Project, and enhance the communication between the potential affectees and the Government. The services commenced in August 2023 and will last for 24 months.

Site Formation and Infrastructure Works for the Development of ex-Cha Kwo Ling Kaolin Mine Site (Phase 2)

The works mainly comprise: 1. site formation; 2. slope works and construction of retaining structures; 3. construction of an at-grade single two-lane carriageway with associated footpaths connecting to the existing Ko Ling Road; 4. off-site junction roadworks; and 5. ancillary works including drainage works, sewerage works, waterworks and landscaping works. The works are scheduled to commence in July 2023 and will take about 40 months to complete.

Site Formation and Infrastructure Works at Tuen Mun Central Phase 2 – Tuen Hing Road

The works mainly comprise site formation works, slope works, construction of a carriageway and footpath connecting to existing Tuen Hing Road, and the ancillary works including drainage, sewerage, waterworks and landscaping works. The works are scheduled to commence in the third quarter of 2023 and will take about 48 months to complete.

Tung Chung New Town Extension – Infrastructure Works at Tung Chung Valley, Yu Tung Road and Ma Wan Chung

The works mainly include: 1. Construction of Road L22 and Road L24; 2. Construction of 2 nos. sewage pumping stations (Ma Wan Chung and Tung Chung Valley (North)); 3. Construction of village sewerage at Ma Wan Chung, Wong Nai Uk and Ngau Au; 4. Construction of Sustainable Urban Drainage System, stormwater attenuation & treatment ponds at Tung Chung Area 45E; 5. Ancillary works including associated civil, geotechnical, drainage, sewerage, water supply, electrical and mechanical engineering and landscaping works; and 6. Implementation of environmental mitigation measures for the works mentioned above. The works are scheduled to commence in late 2024/early 2025 and will take about 43 months to complete.

Hung Shui Kiu/Ha Tsuen New Development Area Second Phase Development – Contract 4 – Site Formation and Engineering Infrastructure Works

The works mainly include: 1. site clearance and formation (including land decontamination works) for about 43 hectares of lands, together with provision of associated engineering infrastructure; 2. construction of district distributor and local roads connecting Hung Shui Kiu/Ha Tsuen New Development Area to Tin Ha Road; 3. construction of pedestrian footbridges; 4. construction of a cycle track cum pedestrian subway and associated retaining walls; 5. revitalisation of some sections of Tin Sam Channel; 6. construction of a sewage pumping station; 7. construction of associated works including water mains, drainage and sewerage works, district cooling mains, cycle tracks, footpaths, box culverts, landscaping works, electrical and mechanical works and other ancillary works; and 8. implementation of environmental mitigation measures (including noise barriers) and environmental monitoring works for the works mentioned above. The works are scheduled to commence in mid 2024 and will take about 54 months to complete.

Landslip Prevention and Mitigation Programme, New Territories West and Outlying Islands, Phase 1, Contract 1

The works mainly comprise upgrading of some 28 government slopes and retaining walls in New Territories West and Outlying Islands. The works are scheduled to commence in July 2024 and will take about 42 months to complete.

Handling of Surplus Public Fill (2024 – 2027)

The works include operation and maintenance of Tseung Kwan O Area 137 Fill Bank and Tuen Mun Area 38 Fill Bank and delivery of public fill to the designated reclamation sites in the Mainland. The works are scheduled to commence in August 2024 and will take about 36 months to complete.

Fanling North New Development Area, Remaining Phase: Site Formation and Infrastructure Works (East)

The works mainly comprise:- 1. site formation of lands and ground investigation within Fanling North New Development Area (FLN NDA); 2. construction of at-grade roads connecting FLN NDA to Fanling Highway and associated junction/road improvements; 3. construction of noise barriers and low noise road surfacing; 4. construction of common utility enclosure and associated works; and 5. ancillary works including footbridges,footpaths, cycle tracks, lighting, traffic aids, sewage pumping stations, drainage, sewerage, water mains, landscaping works, slope works and 6. electrical and mechanical works. The works are scheduled to commence in July 2024 and will take about 66 months to complete.

Kwu Tung North New Development Area, Remaining Phase: Site Formation and Infrastructure Works (South)

The works mainly comprise:- 1. site formation of lands (including site clearance and land decontamination works) and ground investigation within Kwu Tung North New Development Area (KTN NDA); 2. construction of at-grade roads within KTN NDA connecting to Castle Peak Road (Kwu Tung Section) and Fanling Highway; 3. construction of a vehicular bridge connecting proposed Road L1 and Road L2; 4. construction of footbridges at proposed Road P2; 5. construction of noise barriers and low noise road surfacing; 6. construction of common utility enclosure and associated works; 7. construction of a visitor centre; and 8. ancillary works including footpaths, cycle tracks, lighting, traffic aids, drainage, sewerage, water mains, district cooling mains, landscaping works, slope works and electrical and mechanical works. The works are scheduled to commence in July 2024 and will take about 71 months to complete.

Kwu Tung North New Development Area, Remaining Phase: Improvement Works of Fanling Highway (Kwu Tung Portion) and Associated Works

The works mainly comprise:- 1. site clearance and formation (including land decontamination works); 2. widening of Fanling Highway (Kwu Tung Portion); 3. modification of Castle Peak Road (Kwu Tung Portion); 4. construction of footbridges across Fanling Highway (Kwu Tung Portion); 5. construction of Kwu Tung Interchange; 6. modification of Kwu Tung Road and construction of Road L3; 7. construction of associated works including water mains, drainage and sewerage works, roadworks, cycle tracks, footpaths, box culverts, junction improvement works, slope works, retaining walls, street furniture, landscaping works, electrical and mechanical works and other ancillary works; 8. implementation of environmental mitigation measures (including noise enclosures, noise barriers and low-noise road surfacing) and environmental monitoring works for the works mentioned above; and 9. installation of Traffic Control and Surveillance System and conduction of associated testing and commissioning of Fanling Highway (Pak Shek Au, Kwu Tung and Tai Tau Leng Portion). The works are scheduled to commence in July 2024 and will take about 71 months to complete.

Provision of Security Services to the Public Works Central Laboratory Building at 2B Cheung Yip Street, Kowloon Bay, Kowloon, Hong Kong

The services mainly include the security services to the Public Works Central Laboratory Building at 2B Cheung Yip Street, Kowloon Bay. The contract is scheduled to commence on 1 July 2024 for completion in 30 months.

Site Formation and Infrastructure Works at Tsing Yi Road West

The works mainly include:- 1. site formation works and construction of associated retaining wall and slopes; 2. construction of a footbridge across Tsing Yi Road West and associated lift facilities; 3. construction of signalized junction at Tsing Yi Road West near Ching Hong Road; and 4. ancillary works including drainage, sewerage, waterworks and landscaping works. The works are scheduled to commence in June 2024 and will take about 48 months to complete.

Hung Shui Kiu/Ha Tsuen New Development Area Second Phase Development – Environmental Team

The Service Contract is to provide environmental monitoring and auditing services for the construction phase of site formation and infrastructure works for Hung Shui Kiu/Ha Tsuen New Development Area Second Phase Development pursuant to the requirements of Environmental Team (ET) specified in the following documents and to ensure that the environmental performance of the relevant works contracts comply with the requirements of the aforementioned documents and other relevant statutory requirements:- i. nvironmental Permits (EP) for Hung Shui Kiu New Development Area; and ii. Environmental Monitoring and Audit (EM&A) Manual and the approved Environmental Impact Assessment (EIA) Report for Hung Shui Kiu New Development Area (Register No. AEIAR-203/2016). The Service Contract is scheduled to commence in April 2024 and will take about 117 months to complete.

Fanling North New Development Area, Remaining Phase: Fresh Water and Flushing Water Service Reservoirs and Associated Works

The works mainly comprise: 1. construction of a fresh water service reservoir, a flushing water service reservoir and associated site formation, geotechnical, roadworks, power supply, drainage and landscaping works; 2. laying of about 5.7-kilometre-long fresh water mains and about 5.7-kilometre-long flushing water mains; 3. installation of pumps and associated electrical and mechanical works within Shek Wu Hui Water Reclamation Plant constructed by the Water Supplies Department; and 4. implementation of environmental mitigation measures for the works mentioned above. The works are scheduled to commence in the third quarter of 2024 and will take about 40 months to complete.

Landslip Prevention and Mitigation Programme, Hong Kong Island and Outlying Islands, Phase 1, Contract 1

The works include upgrading of some 25 government slopes and retaining walls, natural terrain hazard mitigation works to some 7 natural hillside catchments and enhancement works for some 11 flexible debris-resisting barriers in Hong Kong Island and Outlying Islands. The works are scheduled to commence in July 2024 and will take about 42 months to complete.

Provision of Soil and Rock Testing Services for the Public Works Laboratories – New Territories East (Term Contract)

The services include provision of testing services to soil and rock samples normally originated from the New Territories east region which covers all land areas of the New Territories to the east of a line joining Lo Wu and Chai Wan Kok (excluding Lamma Island, Tsing Yi but including other islands). The services are scheduled to commence in July 2024 and will take about 30 months to complete.

Landslip Prevention and Mitigation Programme, Ground Investigation Term Contract (2024-2027), Contract 1

The works mainly comprise ground investigation and laboratory testing on soil and rock samples obtained from the ground investigation works for some 58 government slopes and retaining walls and some 4 natural hillside study areas areas in Hong Kong Island, Kowloon, the New Territories and Outlying Islands. The works are scheduled to commence in May 2024 and will take about 30 months to complete.

Infrastructure Works at Kwok Shui Road, Tsuen Wan

The works mainly include : - construction of a footbridge across Castle Peak Road - Kwai Chung and associated lift facilities; - widening of a section of the existing single two-lane carriageway of Kwok Shui Road; and - ancillary works including drainage, sewerage, waterworks and landscaping works. The works are scheduled to commence in May 2024 and will take about 36 months to complete.

Landslip Prevention and Mitigation Programme, New Territories East, Phase I, Contract 1

The works mainly comprise upgrading of some 28 government slopes and retaining walls in New Territories East. The works are scheduled to commence in May 2024 and will take about 39 months to complete.

Landslip Prevention and Mitigation Programme, 2021, Package H, Ground Investigation for Landslip Prevention and Mitigation Works

The works mainly comprise ground investigation and laboratory testing on soil and rock samples obtained from the ground investigation works for some 18 government slopes and retaining walls, and some 25 natural hillside catchments in the New Territories. The works are scheduled to commence in March 2024 and will take about 30 months to complete.

Landslip Prevention and Mitigation Programme, New Territories East and New Territories West, Phase 1, Contract 1

The works mainly comprise upgrading of some 25 government slopes and retaining walls and natural terrain hazard mitigation works to some 4 natural hillside catchments in the New Territories. The works are scheduled to commence in April 2024 and will take about 42 months to complete.

Site Formation and Infrastructure Works at Tin Wah Road, Lau Fau Shan

The works mainly comprise: 1. site formation works of about 2.0 hectares at Tin Wah Road, Lau Fau Shan; 2. realigning and widening of an existing un-named road (commonly known as New Sha Kong Wai Road) to single two-lane carriageway; 3. widening of a section of Tin Wah Road to dual two-lane carriageway; 4. construction of noise barriers on this section of Tin Wah Road; and 5. other infrastructure works including drainage, sewerage, waterworks and landscaping. The works are scheduled to commence in March 2024 and will take about 46 months to complete.

Hung Shui Kiu/Ha Tsuen New Development Area Second Phase Development – Contract 2 – Fresh Water Service Reservoir and Associated Mainlaying Works

The works mainly include: 1. site clearance and formation for about 8.5 hectares of lands; 2. construction of Tan Kwai Tsuen East Fresh Water Service Reservoir and associated roadworks, power supply and landscaping works; 3. laying of about 4.5 km long fresh water mains and about 3.5 km long flushing water mains; and 4. implementation of environmental mitigation measures and related environmental monitoring and audit programme for 5. the works mentioned above. The works are scheduled to commence in early 2024 and will take about 57 months to complete.

Tender for the Provision of Computer Software Licence Renewal to the Civil Engineering and Development Department

Not Applicable

DSD

Drainage Services Department

Expansion of Floating Photovoltaic System at San Tin Polder

Site Trial of New Type Screen Plants and Odour Suppressing Agent at Preliminary Treatment Works

Term Consultancy for Drainage and Sewerage Improvement and Construction in Mainland South Districts (2023 – 2028) – Investigation, Design and Construction

Term Contract for Waste Disposal and Minor Civil Engineering Works for Various Sewage Treatment Plants and Pumping Stations in Urban Area, Lantau Island and Outlying Islands

Drainage Improvement Works in Mui Wo – Design and Construction

Term Consultancy for Drainage and Sewerage Improvement and Construction in Mainland North Districts (2023 – 2028) – Investigation, Design and Construction

Structural Improvement of Sewers and Stormwater Drains Package 1A – Central & Western, Wan Chai, Eastern, Yau Tsim Mong and Sham Shui Po

Drainage Maintenance and Construction in Mainland South Districts (2023-2027)

Drainage Improvement Works in Tsuen Wan and Kwai Tsing – Investigation, Design and Construction

North District Sewerage Stage 1 Phase 2C and Stage 2 Phase 1 – Village Sewerage in Sheung Shui Heung

Term Consultancy for Drainage and Sewerage Improvement and Construction in Hong Kong Island and Islands Districts (2023 – 2028) – Investigation, Design and Construction

North District Sewerage Stage 1 Phase 2C and Stage 2 Phase 1 – Village Sewerage in Sheung Shui Heung – Design and Construction

Rehabilitation of Underground Sewers – Stage 4

Drainage Improvement Works at North District – Phase 1

Revitalisation of Middle Tuen Mun River Channel – Investigation, Design and Construction

Term Contract for Provision of Sampling and Analyzing of Samples for Various Sewage Treatment Facilities in Urban Area, Lantau and Outlying Islands to the Drainage Services Department (2023-2026)

Construction of Trunk Sewage Rising Main in Cheung Sha Wan

Relocation of Sha Tin Sewage Treatment Works to Caverns – Upstream Sewerage Works – Main Works

Enhancement of Electrical and Mechanical Installations for Tai Po Effluent Pumping Station at Tai Po Sewage Treatment Works

Term Contract for Inspection, Repair, Overhaul and Testing of Electrical and Mechanical Installations at Various Sewage Treatment Works and Pumping Stations in New Territories West and New Territories North (2023-2026)

Drainage Improvement Works at North District (Phase 2) — Design and Construction

Relocation of Sha Tin Sewage Treatment Works to Caverns – Ancillary Buildings, Cavern Ventilation System and Associated Works

Drainage Improvement Works in Tuen Mun — Investigation, Design and Construction

Term Contract for Inspection, Repair, Overhaul and Testing of Electrical and Mechanical Installations at Various Sewage Treatment Works and Pumping Stations in Sha Tin and Sai Kung (2023-2026)

Relocation of Sha Tin Sewage Treatment Works to Caverns – Civil Works for Sewage Treatment Facilities and Associated Works

The works include:– a) construction of the civil structures for sewage and sludge treatment facilities and the associated utilities and roadworks of the proposed Sha Tin Cavern Sewage Treatment Works; b) construction of two (2) maintenance workshop buildings; c) construction and installation of fire services, building services installations and related electrical and mechanical facilities in ancillary buildings; and d) other related works. The works are scheduled to commence in December 2024 and will take about 61 months to complete.

Enhancement of High Voltage Electrical Equipment at Tseung Kwan O Preliminary Treatment Works

The works involve enhancement of the existing high voltage electrical installations at Tseung Kwan O Preliminary Treatment Works. The equipment includes three (3) numbers of high voltage transformers, two (2) numbers of high voltage switchboards and associated cabling and controlling system. The works are scheduled to commence in July 2024 for completion in January 2027.

West Kowloon and Tsuen Wan Village Sewerage – Phase 2 (Package 1)

The scope of works comprises the provision of approximately 1.3 kilometres of public sewers for one unsewered area in West Kowloon and approximately 3.3 kilometres for three unsewered areas in Tsuen Wan; and ancillary works. The works are scheduled to commence in September 2024 for completion in September 2028.

Structural Improvement of Sewers and Stormwater Drains Package 1C – Kwai Tsing, Tsuen Wan, Sha Tin, Tai Po and North

The works include the rehabilitation of some underground sewers, stormwater drains and associated manholes in Kwai Tsing, Tsuen Wan, Sha Tin, Tai Po and North Districts. The works are scheduled to commence in August 2024 for completion in January 2028.

Site trial of travelling band screen at Kwai Chung Preliminary Treatment Works

The works to be executed under this contract involve site trial installation of travelling band screen at one of the fine screens in Kwai Chung Preliminary Treatment Works with modification of the existing facilities and the associated ancillary E&M and civil works. The works are scheduled to commence in March 2024 for completion in April 2025.

Supply of Liquid Oxygen to the Drainage Services Department

The Goods to be provided is Liquid Oxygen to Tung Chung Sewage Pumping Station. The contract is scheduled to commence in May 2024 for 24 months tentatively.

Term Contract for Greening, Landscaping and Establishment Works at Sewage Treatment and Flood Prevention Facilities under Sewage Treatment Division 1

This is a 48-month term contract for greening, landscaping and establishment works for sewage treatment and flood prevention facilities under Sewage Treatment Division 1. The works are scheduled to commence in June 2024 for completion in May 2028.

Supply of Membrane Filtration Modules for Membrane Filtration Tank at Shek Wu Hui Sewage Treatment Works to the Drainage Services Department

The Goods to be provided is for the membrane filtration at Shek Wu Hui Sewage Treatment Works of DSD.

Provision of Electrical and Mechanical Facilities for Lai Chi Wo Sewage Treatment Plant

The works include the provision of electrical and mechanical facilities for Lai Chi Wo Sewage Treatment Plant. The works are scheduled to commence in the first quarter of 2024 for completion in the fourth quarter of 2026.

Provision of Electrical and Mechanical Equipment for Sha Tin Intermediate Sewage Pumping Station

The works include provision and installation of electrical and mechanical equipment for Sha Tin Intermediate Sewage Pumping Station. The works are scheduled to commence in the second quarter of 2024 for completion in the fourth quarter of 2028.

Site Formation Works for Hung Shui Kiu Effluent Polishing Plant Phase 1

The works include demolition of the decommissioned San Wai Preliminary Treatment Works, associated ground investigations works, land decontamination works, site formation works and ancillary works for western site of Hung Shui Kiu Effluent Polishing Plant. The works are scheduled to commence in March 2024 for completion in August 2025.

Supply of 25% and 50% Sodium Hydroxide Solution to the Drainage Services Department

The Goods to be provided is sodium hydroxide solution for pH control in sewage treatment facilities. The contract is scheduled to commence in February 2024 for 24 months tentatively.

Supply of Polyelectrolyte (Type V) to Drainage Services Department

The Goods to be provided is for dewatering of digested sludge in sewage treatment works of DSD.

EMSD

Electrical & Mechanical Services Department

Triennial Term Contract for Engineering Maintenance Services and Other Supporting Services for Electronics Installations of the Global Maritime Distress and Safety System (GMDSS) and Vessel Traffic Services System (VTSS) for Marine Department of the Government of the Hong Kong Special Administrative Region

The scope of the works includes provision of operation and maintenance services for electronics and related installations of the GMDSS and VTSS for Marine Department of the Government of the Hong Kong Special Administrative Region. The contract is scheduled to commence in April 2024 for expiry in March 2027.

Triennial Term Contract for Maintenance and Repair of Floodlighting Installations of Municipal Venues for the Government of the Hong Kong Special Administrative Region

The scope of the works includes maintenance and repair of floodlighting installations at Municipal Venues for the Government of the Hong Kong Special Administrative Region. The Contract is scheduled to commence in May 2024 for expiry in April 2027.

District Cooling System (DCS) at Kai Tak Development (KTD) Phase IIIR – Electrical and Mechanical Installation at Sites 1E1 and 1F1

The scope of the Works includes the supply, delivery and installation, testing and commissioning of the chilled water system and its accessories for the DCS at the Kai Tak Development. The Contract is scheduled to commence in February 2024 and for completion in February 2025.

Design-Build-Operate Contract for the Phase 1 District Cooling System (DCS) at Kwu Tung North New Development Area (KTN NDA) (NEC4 DBOC)

The scope of works includes: i. design and construction of the Phase 1 DCS plant including associated DCS plant building and DCS plant equipment; and ii. subsequent operation of completed DCS in KTN NDA. The Contract is scheduled to commence in December 2023 for completion in March 2036.

Triennial Term Contract for the Comprehensive Maintenance and Repair of Escalator Installations at Central Government Offices, Chief Executive’s Office and Legislative Council Complex, Tamar

The scope of the works includes comprehensive maintenance and repair of escalator installations at Central Government Offices, Chief Executive’s Office and Legislative Council Complex, Tamar. The Contract is scheduled to commence in May 2024 for expiry in April 2027.

Supply and Installation of Automatic Vehicle Clearance Support System for Goods Vehicle in Shenzhen Bay Control Point

The scope of the Works includes supply and Installation of the Automatic Vehicle Clearance Support System (AVCSS) installations for Hong Kong Boundary Crossing Facilities (HKBCF) at Shenzhen Bay Control Point. The Contract is scheduled to commence in November 2023 for completion in November 2024.

Triennial Term Contract for Maintenance of Automatic Vehicle Clearance Support System of Hong Kong-Zhuhai-Macao Bridge Hong Kong Port (HZMB HKP) and Shenzhen Bay Control Point (SBCP)

The scope of the works includes provision of maintenance services, alteration, addition and improvement works of the Automatic Vehicle Clearance Support System of HZMB HKP and SBCP. The Contract is scheduled to commence in November 2023 for expiry in November 2026.

Triennial Term Contract for Provision of Maintenance and Modification Works of Traffic Control and Surveillance System of Tolo-Highway

The scope of the works includes provide the maintenance service and modification works of existing Traffic Control and Surveillance System of Tolo-Highway. The Contract is scheduled to commence in January 2024 for expiry in January 2027.

Triennial Term Contract for Electrical, Mechanical, Air-conditioning, and Building Services Fitting-out, Replacement, and Improvement Works for Various Venues in Hong Kong Region

The scope of the works includes Electrical, Mechanical, Air-conditioning, and Building Services Fitting-out, Replacement, and Improvement Works for various government venues in Hong Kong Island. The Contract is scheduled to commence in February 2024 for expiry in January 2027.

Term Contract for the Maintenance and Repair of, Alteration, Addition and Improvement Works to Electrical Installations Maintained by Kowloon Maintenance Sub-division of General Engineering Services Division

The scope of the works includes maintenance and repair of, alteration, addition and improvement works to electrical installations maintained by General Engineering Services Division of the Electrical and Mechanical Services Department. The contract is scheduled to commence in March 2024 for expiry in March 2027.

Triennial Term Contract for Operation and Maintenance of Air-conditioning Installations in Various Venues of the Government of the Hong Kong Special Administrative Region Maintained by New Territories Maintenance Sub-division of General Engineering Services Division

The scope of the works includes operation, maintenance, alteration, addition and improvement of air-conditioning installations in various venues of the Government of the Hong Kong Special Administrative Region maintained by New Territories Maintenance Sub-division of General Engineering Services Division. The Contract is scheduled to commence in March 2024 for expiry in February 2027.

Triennial Term Contract for the Comprehensive Maintenance and Repair of Lift Installations at Central Government Offices, Chief Executive’s Office and Legislative Council Complex, Tamar

The scope of the works includes comprehensive maintenance and repair of lift installations at Central Government Offices, Chief Executive’s Office and Legislative Council Complex, Tamar. The Contract is scheduled to commence in January 2024 for expiry in December 2026.

Triennial Term Contract for the Maintenance of Electrical and Mechanical Installations at Tuen Mun Children and Juvenile Home, Siu Lam Integrated Rehabilitation Service Complex and Various Premises in New Territories Region

The scope of the works includes operation, maintenance, repair, alteration, addition and improvement of electrical and mechanical installations at Tuen Mun Children and Juvenile Home, Siu Lam Integrated Rehabilitation Service Complex and Various Premises in New Territories Region. The Contract is scheduled to commence in January 2024 for expiry in December 2026.

Triennial Term Contract for Provision of Maintenance, Modification and Installation Works of Electronic and E&M Control Systems at Various Sewage Treatment Works and Their Outstations for Drainage Services Department

The scope of the works includes maintenance, repair, alteration and additional services of electronic and E&M control systems at various sewage treatment works and their outstations across Kowloon, the New Territories and outlying islands. The Contract is scheduled to commence in December 2023 for expiry in November 2026.

Triennial Term Contract for Operation and Maintenance of Air-conditioning Installations for Hong Kong Police Force, Correctional Services Department, Fire Services Department, Independent Commission Against Corruption and Security Bureau in Hong Kong Cluster for the Government of The Hong Kong Special Administrative Region

The scope of the works includes operation, maintenance and alteration, addition, improvement and replacement works of air-conditioning installations for venues of the Hong Kong Police Force, Correctional Services Department, Fire Services Department, Independent Commission Against Corruption and Security Bureau in Hong Kong Cluster. The contract is scheduled to commence in January 2024 for expiry in December 2026.

Quadrennial Term Contract for the Comprehensive Maintenance and Repair of Lift Installations at Various Premises of the Government of the Hong Kong Special Administrative Region (Package One of KO15)

To provide comprehensive maintenance and repair of Lift Installations at various premises of the Government of Hong Kong Special Administrative Region.

Triennial Term Contract for Operation and Maintenance of Electrical, Mechanical and Other Installations at Marine Ferry Terminals, Government Dockyard, Kai Tak Cruise Terminal and Municipal Venues of the Government of the Hong Kong Special Administrative Region

Triennial Term Contract for Operation and Maintenance of Electrical, Mechanical and Other Installations at Marine Ferry Terminals, Government Dockyard, Kai Tak Cruise Terminal and Municipal Venues of the Government of the Hong Kong Special Administrative Region

Triennial Term Contract for the Comprehensive Maintenance and Repair of Escalator Installation at Various Premises of the Government of the Hong Kong Special Administrative Region (Package Two of OT22)

Triennial Term Contract for the Comprehensive Maintenance and Repair of Escalator Installation at Various Premises of the Government of the Hong Kong Special Administrative Region (Package Two of OT22)

Provision of Light Goods Vehicles for Hiring by Electrical and Mechanical Services Department

Provision of Light Goods Vehicles for Hiring by Electrical and Mechanical Services Department. The agreement, commencing on 1 December 2023 or any other date as specified on the letter of acceptance (whichever is the later), will last for 24 months.

Triennial Term Contract for Operation and Maintenance of Air-conditioning Installations in Various Venues of the Government of the Hong Kong Special Administrative Region Maintained by Hong Kong Maintenance Sub-division ONE of General Engineering Services Division

The scope of the Works includes operation, maintenance, alteration, addition and improvement of air-conditioning installations in various venues of the Government of the Hong Kong Special Administrative Region maintained by Hong Kong Maintenance Sub-division ONE of General Engineering Services Division. The Contract is scheduled to commence in January 2024 for expiry in December 2026.

Replacement of HV & LV Electrical Supply & Distribution Systems and Generator System at the Shing Mun Tunnels

The scope of the Works includes the replacement of HV switchboards, transformers, LV switchboards, generator, together with connecting power and signal cables, and other associated accessories at Shing Mun Tunnels. The Contract period is scheduled to commence in Jun 2023 and for completion in Dec 2026.

Triennial Term Contract for the Comprehensive Maintenance and Repair of Escalator Installation at Various Premises of the Government of the Hong Kong Special Administrative Region (Package One of SC22)

The scope of the Works includes comprehensive maintenance and repair of escalator installations at various premises of the Government of the Hong Kong Special Administrative Region. The Contract is scheduled to commence in November 2023 for expiry in October 2026.

Triennial Term Contract for Operation and Maintenance of Air-conditioning Installations in Various Venues of the Government of the Hong Kong Special Administrative Region Maintained by Hong Kong Maintenance Sub-division TWO of General Engineering Services Division

The scope of the Works includes operation, maintenance, alteration, addition and improvement of air-conditioning installations in various venues of the Government of the Hong Kong Special Administrative Region maintained by Hong Kong Maintenance Sub-division TWO of General Engineering Services Division. The Contract is scheduled to commence in January 2024 for expiry in December 2026.

Supply and Installation for baggage identification and tracking system in Hong Kong International Airport (HKIA)

The scope of the works includes the design, supply, installation, testing, commissioning, training, maintenance and warranty of a Baggage Identification and Tracking (BIT) System at the Hong Kong International Airport (HKIA) for Customs & Excise Department (C&ED). The BIT System shall adopt custom-made Artificial Intelligence (AI) solutions with the use of fusion technologies consists of RFID and Video Analytics (VA) to achieve high accuracy of target identification and tracking. The Contract is scheduled to commence in August 2023 for completion in December 2024.

PCCW Technical Services Limited

The scope of the Works includes dismantling and renovation of existing Traffic Control and Surveillance System, including supply, installation, testing and commissioning of new system and migration of services. The new Traffic Control and Surveillance System shall mainly consist of computerised central control system, traffic control and surveillance field equipment, communication network etc. The civil works include construction and erection of mounting structures for traffic control and surveillance field equipment. The Contract is scheduled to commence in July 2023 for completion in July 2025.

Provision of SAP Enterprise Support Service from year 2024 to year 2025 to the Electrical and Mechanical Services Trading Fund

The scope of services covered by this tender comprises: 1) rendering Enterprise Support for all SAP ERP system components serving the Electrical and Mechanical Services Trading Fund under authorisation of the original software vendor; 2) providing related technical support resources including right of access to online resources and service granted by the original software vendor, such as SAP Notes and SAP ONE Support Launchpad portal; and 3) rendering support services in response to any potential SAP license audit.

Quadrennial Term Contract for the Comprehensive Maintenance and Repair of Lift Installations at Various Premises of the Government of the Hong Kong Special Administrative Region (Package Two of KO22)

The scope of the Works includes comprehensive maintenance and repairing of lift installation at various premises of the Government of the Hong Kong Special Administrative Region. The Contract is scheduled to commence in June 2023 for expiry in May 2027.

Triennial Term Contract for the Maintenance and Repair of, Alterations and Additions to, Fire Service Installations for the Venues of Boundary Crossing Facilities and Transport Services Division for the Government of HKSAR

The scope of the Works includes the provision of fault attendance, preventive maintenance, corrective maintenance, repair and replacement services, alternation and additional works on fire service installations at various premises, such as footbridges, subways, carparks, driving test centres, ferry piers, public transport interchange, vehicle examination centres, boundary control points and offices, of Boundary Crossing Facilities and Transport Services Division for the Government of HKSAR. The Contract is scheduled to commence in November 2023 for expiry in October 2026.

Quadrennial Term Contract for Comprehensive Maintenance of Pumping Installations at Correctional Services Department and Other Disciplined Services Venues

The scope of the Works includes comprehensive maintenance for pumping installations at various venues of the Correctional Services Department and other disciplined services. The Contract is scheduled to commence in January 2024 for expiry in January 2028.

42-Month Term Contract for the Fault Attendance, Comprehensive Maintenance, Repair and Replacement of Structure Lighting System at Various Premises of the Highways Department of the Government of HKSAR

The scope of the Works includes the provision of fault attendance, preventive maintenance, corrective maintenance, repair and replacement services on structure lighting works, such as subway, footbridge, walkway, ferry concourse and tram shelter lighting installations at various premises of the Highways Department of the Government of HKSAR. The Contract is scheduled to commence in October 2023 for expiry in April 2027.

Triennial Term Contract for the Operation and Maintenance of Air-conditioning Installations for Attended Municipal Venues in Hong Kong Region

The scope of the Works includes operation and maintenance of air-conditioning installations for attended municipal venues in Hong Kong Region. The Contract is scheduled to commence in August 2023 for expiry in July 2026.

Replacement of Chiller Plants and Associated Works at Tai Po Complex

The scope of works for this Contract includes the replacement of chiller plant and associated works at Tai Po Complex. The Contract is scheduled to commence in April 2023 for completion in April 2025.

Provision of Administration Support Services for Training Unit and Supplies Sub-division of Electrical & Mechanical Services Department

Provision of Administration Support Services for Training Unit and Supplies Sub-division of Electrical & Mechanical Services Department. The contract will last for 24 months.

Replacement of Fire Service System at Tate's Cairn Tunnel

The scope of Works includes the replacement of fire service system at Tate's Cairn Tunnel. The Contract period is scheduled to commence in April 2023 for completion in April 2026.

36-month Term Contract for Maintenance of SCADA System of Hong Kong Boundary Crossing Facilities (HKBCF) at Hong Kong Zhuhai Macao Bridge.

The scope of the Works includes provision of maintenance services, alteration, addition, replacement and improvement works of the SCADA system of Hong Kong Boundary Crossing Facilities (HKBCF) at Hong Kong Zhuhai Macao Bridge. The Contract is scheduled to commence in August 2022 for expiry in July 2025.

Replacement of Voice Communication Systems of Tsing Sha Control Area

The scope of the Works includes dismantling and renovation of existing Voice Communication Systems in the Tsing Sha Control Area (TSCA), including supply, installation, testing and commissioning of new system and migration of services. The new Voice Communication Systems shall mainly consist of Private Automatic Branch Exchange (PABX) Central System, Emergency Telephone (EMT) Central System, media gateway and associated field equipment. The Contract is scheduled to commence in May 2023 for completion in November 2024.

Supply and Installation of Audio Visual System for the Auditorium and Multi-function Rooms of the Chinese Medicine Hospital

The scope of the Works includes the supply and installation of AV Systems for the auditorium and multi-function classroom at 2/F of Chinese Medicine Hospital (CMH), including the system design, manufacture, delivery, installation, testing, commissioning, defect liability and training. The Contract is scheduled to commence in April 2023 for completion in June 2025.

Triennial Term Contract for Maintenance of Security and Electronic Systems at Hong Kong-Zhuhai-Macao Bridge Hong Kong Port (HZMB HKP) and Other Airport Engineering Services Venues

The scope of the Works includes provision of maintenance services, alteration, addition, replacement and improvement works of the security and electronic systems at Hong Kong-Zhuhai-Macao Bridge Hong Kong Port (HZMB HKP) and other airport engineering services venues. The Contract is scheduled to commence in July 2023 for expiry in June 2026.

Replacement and Enhancement of Belisha Beacons at Zebra Crossings

The scope of the works includes supply and replacement of around 500 sets of existing Belisha Beacons with enhanced design at around 220 various zebra crossings in Hong Kong. The associated civil works include the assessment and monitoring of the erection and structural arrangement of the new Belisha Beacons posts to be installed at original location. The contract is scheduled to commence in July 2024 for completion in July 2027.

Triennial Term Contract for the Maintenance of Mechanical Installations for the Venues of Boundary Crossing Facilities and Transport Services Division for the Government of HKSAR

The scope of the works include provision of maintenance services, and carrying out of alteration, addition, replacement and improvement works of the mechanical installations for venues of the Customs and Excise Department, Immigration Department, Transport Department, Highways Department and Other Departments in Hong Kong, Kowloon and New Territories. The contract is scheduled to commence in September 2024 for expiry in August 2027.

Quadrennial Term Contract for Maintenance of Fire Service Installations for Hong Kong Police Force, Correctional Services Department, Drainage Services Department, Fire Services Department, Independent Commission Against Corruption and Security Bureau for Hong Kong Island and Outlying Islands

The scope of the works includes maintenance, repair, alteration and addition services of fire service installations for the venues of the Hong Kong Police Force, Correctional Services Department, Drainage Services Department, Fire Services Department, Independent Commission Against Corruption and Security Bureau. The contract is scheduled to commence in February 2025 for expiry in January 2029.

Triennial Term Contract for Overhaul, Maintenance and Related Works of Water Treatment Installations at Various Swimming Pools in Hong Kong Special Administrative Region

The scope of the works is to provide overhaul, maintenance, testing, replacement of Plant and parts, and other associated works related to water treatment installations at various swimming pools in Hong Kong Special Administrative Region. The Contract is scheduled to commence in July 2024 for expiry in June 2027

Triennial Term Contract for the Operation and Maintenance of Electrical, Mechanical and Other Installations for Municipal Venues in New Territories West of the Government of the Hong Kong Special Administrative Region

The Scope of works includes operation and maintenance of electrical, mechanical and other installations at municipal venues in New Territories West of Hong Kong. The contract is scheduled to commence in July 2024 for expiry in June 2027.

Quadrennial Term Contract for Maintenance of Security and Electronics Systems at Lo Wu Correctional Institution, Tai Lam Centre for Women and Other Venues for Correctional Services Department

The scope of the works includes comprehensive maintenance for the security and electronics systems, including CCTV, ELSS and PA at Lo Wu Correctional Institution, Tai Lam Centre for Women, etc. of Correctional Services Department and other disciplined services. The contract is scheduled to commence in September 2024 for expiry in August 2028.

Tender for the Supply of Cross-Country Vehicles (Special Duty) to the Electrical and Mechanical Services Department by 2 consignments, the vehicles to be ready to use within 12 months and 14 months from the contract date.

The Vehicles shall be used by the Hong Kong Police Force (VIP Protection Unit) to perform special operation.

Provision of Maintenance and Modification Works of Data Acquisition Systems of Free-flow Tolling System in Lion Rock Tunnel, Shing Mun Tunnels and Tsing Sha Control Area (12 Months)

The scope of the works includes provide the maintenance service and modification works of Data Acquisition Systems of Free-flow Tolling System in Lion Rock Tunnel, Shing Mun Tunnels and Tsing Sha Control Area. The contract is scheduled to commence in May 2024 for expiry in May 2025.

Term Contract for the Maintenance and Repair of, Alteration, Addition and Improvement Works to Electrical Installations Maintained by Hong Kong 2 Maintenance Sub-division of General Engineering Services Division

The scope of the works includes maintenance and repair of, alteration, addition and improvement works to electrical installations maintained by General Engineering Services Division of the Electrical and Mechanical Services Department. The contract is scheduled to commence in November 2024 for expiry in October 2027.

Triennial Term Contract for the Comprehensive Maintenance and Repair of High Mast and High Bay Lightings for the Government of the Hong Kong Special Administrative Region

The scope of the works includes the comprehensive maintenance and repair of high mast and high bay lighting installations for the Government of the Hong Kong Special Administrative Region. The contract is scheduled to commence in May 2024 for expiry in May 2027.

Triennial Term Contract for the Engineering Services for E&M and Other Installations at Crematoria and Columbaria of the Government of the Hong Kong Special Administrative Region

The scope of the service includes the engineering services of electrical, mechanical and other installations at Crematoria and Columbaria of the Government of the Hong Kong Special Administrative Region. The contract is scheduled to commence in June 2024 for expiry in May 2027.

Tender for the Supply of Mini Ambulances to the Electrical and Mechanical Services Department, the vehicles to be ready to use within 13 months from the contract date.

The Vehicles will be used by the Fire Services Department to provide emergency ambulance services for persons whose conditions required immediate pre-hospital treatment and transfer to hospital for medical attention at outlying islands of Hong Kong.

Triennial Term Contract for Operation and Maintenance of Air-conditioning Installations for Various Venues of Security and Vehicle Services Division in Kowloon Cluster

The scope of works includes operation, maintenance, replacement, alterations, additions and improvement works of air-conditioning installations for the venues of the Hong Kong Police Force, Fire Services Department, Immigration Department, Customs and Excise Department, Independent Commission Against Corruption, Drainage Services Department, and Security Bureau in Kowloon. The contract is scheduled to commence in July 2024 for expiry in June 2027.

Five-year Term Contract for Maintenance, Modification and Installation Works of Sydney Coordinated Adaptive Traffic System (SCATS)

The scope of the Works includes maintenance, modification and installation works for the Sydney Coordinated Adaptive Traffic System (SCATS) of Hong Kong Island, Tai Po and North District as well as provision of first line maintenance for traffic signals and accessories equipment. The Contract is scheduled to commence in June 2024 for expiry in June 2029.

Provision of Electric Locks Security System in Pik Uk Correctional Institution for Correctional Services Department

The scope of the Works includes supply, delivery, installation, testing and commissioning of high security electro-mechanical locks, CCTV cameras with video recording, access control system, metal gates and associated building works at Pik Uk Correctional Institution for Correctional Services Department. The Contract is scheduled to commence in June 2024 for completion in May 2028.

Tender for the Supply of Large Ambulances to the Electrical and Mechanical Services Department, the vehicles to be ready to use within 12 months from the contract date.

The Vehicles will be used to provide patient transfer services for inter-hospital transfer procedure and evacuation of persons with less severe injuries in mass casualty incidents by the Fire Services Department.

Triennial Term Contract for the Comprehensive Maintenance and Repair of Lift Installations at Various Premises of the Government of the Hong Kong Special Administrative Region (SG24)

The scope of the works includes comprehensive maintenance and repair of lift installations at various premises of the Government of the Hong Kong Special Administrative Region. The contract is scheduled to commence in April 2024 for expiry in March 2027.

Triennial Term Contract for Operation and Maintenance of Electrical, Mechanical and Other Installations at Municipal Venues in Hong Kong Region

The scope of the works includes comprehensive maintenance and repair of escalator installations at various premises of the Government of the Hong Kong Special Administrative Region. The Contract is scheduled to commence in May 2024 for expiry in April 2027.

Triennial Term Contract for the Provision of Maintenance Service of Fixed X-ray Vehicle Inspection System at Shenzhen Bay Control Point

The scope of the works includes provision of maintenance services for Fixed X-ray Vehicle Inspection System at Shenzhen Bay Control Point. The Contract is scheduled to commence in May 2024 for expiry in April 2027.

Triennial Term Contract for Provision of Maintenance and Modification Works of Traffic Control and Surveillance System at Open Road Section of Hong Kong Link Road and Tuen Mun Chek Lap Kok Link Southern Connection

The scope of the works includes provide the maintenance service and modification works of existing Traffic Control and Surveillance System at Open Road Section of Hong Kong Link Road and Tuen Mun Chek Lap Kok Link Southern Connection. The Contract is scheduled to commence in March 2024 for expiry in March 2027.

Triennial Term Contract for The Comprehensive Maintenance and Repair of Escalator Installations at Various Premises of the Government of the Hong Kong Special Administrative Region (KO23)

The scope of the works includes comprehensive maintenance and repair of escalator installations at various premises of the Government of the Hong Kong Special Administrative Region. The Contract is scheduled to commence in May 2024 for expiry in April 2027.

Triennial Term Contract for the Comprehensive Maintenance and Repair of Lift Installations at Various Premises of the Government of the Hong Kong Special Administrative Region (Package One of FT23)

The scope of the works includes comprehensive maintenance and repair of lift installations at various premises of the Government of the Hong Kong Special Administrative Region. The Contract is scheduled to commence in July 2024 for expiry in June 2027.

District Cooling System (DCS) at Kai Tak Development (KTD) Phase IIIR – Electrical and Mechanical Installation at Sites 1E1 and 1F1

The scope of the Works includes the supply, delivery and installation, testing and commissioning of the chilled water system and its accessories for the DCS at the Kai Tak Development. The Contract is scheduled to commence in February 2024 and for completion in February 2025.

Tender for the Supply of Tactical Bus (VIP) to the Electrical and Mechanical Services Department, the vehicle to be ready to use within 14 months from the contract date

The vehicle shall be supplied to the Hong Kong Police Force (VIP Protection Unit) to perform special operation.

Triennial Term Contract for Engineering Maintenance Services and Other Supporting Services for Electronics Installations of the Global Maritime Distress and Safety System (GMDSS) and Vessel Traffic Services System (VTSS) for Marine Department of the Government of the Hong Kong Special Administrative Region

The scope of the works includes provision of operation and maintenance services for electronics and related installations of the GMDSS and VTSS for Marine Department of the Government of the Hong Kong Special Administrative Region. The contract is scheduled to commence in April 2024 for expiry in March 2027.

Triennial Term Contract for The Comprehensive Maintenance and Repair of Lift Installations at Various Premises of the Government of the Hong Kong Special Administrative Region (Package Two of SC19)

The scope of the works includes comprehensive maintenance and repairing of lift installation at various premises of the Government of the Hong Kong Special Administrative Region. The Contract is scheduled to commence in May 2024 for expiry in April 2027.

Triennial Term Contract for the Comprehensive Maintenance and Repair of Lift Installations at Various Premises of the Government of the Hong Kong Special Administrative Region (Package One of TO23)

The scope of the works includes comprehensive maintenance and repair of lift installations at various premises of the Government of the Hong Kong Special Administrative Region. The Contract is scheduled to commence in March 2024 for expiry in February 2027.

Triennial Term Contract for the Maintenance and Repair of Burglar Alarm and Security Installation at Various Municipal Venues for the Government of the Hong Kong Special Administrative Region

The scope of works includes the maintenance and repair of burglar alarm and security installations at various municipal venues for the Government of the Hong Kong Special Administrative Region. The contract is scheduled to commence in June 2024 for expiry in May 2027.

Tender for the Supply of Water Wagons to the Electrical and Mechanical Services Department, the vehicles to be ready to use within 15 months from the contract date

The vehicles shall be supplied to the Water Supplies Department (“WSD”) for the provision of potable water to the public.

Triennial Term Contract for the Maintenance of Electrical and Mechanical Installations at Hong Kong Wetland Park, Kwu Tung North Multi-welfare Services Complex and Various Premises in New Territories Region

The scope of the works includes operation, maintenance, repair, alteration, addition and improvement of electrical and mechanical installations at Hong Kong Wetland Park, Kwu Tung North Multi-welfare Services Complex and Various Premises in New Territories Region. The Contract is scheduled to commence in March 2024 for expiry in February 2027.

Tender for the Supply of Passive Millimetre Wave Screening Systems to the Electrical and Mechanical Services Department, the goods to be ready to use in 2 consignments within 3 months and 6 months from the contract date

The systems will be used for non-intrusive screening of human body under clothing for concealed contraband items by the Customs and Excise Department of the Government.

HYD

Highways Department

Highways Department Term Contract (Landscape Works in Kowloon East, Sha Tin, Sai Kung and Islands Districts excluding Expressways and High Speed Roads 2023-2026)

Tsing Yi - Lantau Link - Marine Ground Investigation (NEC4/ECC/Option B)

Replacement of Structure Lighting with Light Emitting Diode in Kowloon City District (NEC4/ECC/Option B)

Management, Operation, Installation and Maintenance of the Public Lighting System in New Territories West (2023 - 2027) (NEC4 TSC Option A)

Improvement of Lion Rock Tunnel – Site Investigation (NEC4 ECC Option B)

Provision of Universal Accessibility Facilities at Footbridges, Elevated Walkways and Subways – Package 7 Contract 2 (NEC4 ECC Option C, BIM)

Route 11 (Section between Yuen Long and North Lantau) – Horizontal Directional Coring (NEC4 ECC Option C)

Pedestrian Connection between Tamar Footbridge (Highway Structure No. HF189) and Admiralty Centre (NEC4 ECC Option A)

Central Kowloon Route – Remaining Works

The works mainly include: (i) design and construction of landscaping works at Yau Ma Tei Landscaped Deck, Yau Ma Tei Rest Gardens, North Tree Park and Kai Tak Phase 2B Landscaped Deck; (ii) improvement of a section of Kai Fuk Road of approximately 300m in length; (iii) planting of compensatory trees; and (iv) associated civil works, electrical and mechanical works, road and drainage works, lighting works and establishment works. The works are scheduled to commence in August 2024 and will take about 46 months to complete.

Provision of Universal Accessibility Facilities at Footbridges, Elevated Walkways and Subways – Package 8 Contract 1

The works mainly include: (a) construction of 32 lifts at 20 walkways located in Sai Kung, Tuen Mun, Kwun Tong, Wong Tai Sin, Kwai Tsing, Sha Tin, Tsuen Wan, Tai Po, North District and Southern District; (b) remaining works of 14 lifts at 9 walkways located in Kwun Tong, Wong Tai Sin, Kowloon City, Sham Shui Po and Eastern District; and (c) associated civil works, geotechnical works, electrical and mechanical works, modification works for the existing walkways, roads and drainage works, lighting works and landscaping works. The works are scheduled to commence in June 2024 and will take about 42 months to complete

Replacement of Structure Lighting with Light Emitting Diode in Sham Shui Po District

The works include: a. replacement of approximately 800 existing lighting points at footbridges, subway and public transport interchange in Sham Shui Po District with light emitting diode (LED) luminaires; and b. associated lighting system improvement works. The works are scheduled to commence in April 2024 and will take about 21 months to complete.

Construction of Bus-Bus Interchange at Aberdeen Tunnel, Walkway Covers at Central & Western District and Kwai Tsing District (Remaining Works) and Footbridge across Tsui Ping Road

The works mainly comprise: a. Construction of a bus-bus interchange with bus lay-bys, bus stacking areas and walkway covers at Aberdeen Tunnel; b. Construction of walkway covers at Rock Hill Street and Hang Mei Street; c. Construction of a footbridge across Tsui Ping Road; and d. Associated civil works, geotechnical and slope works, electrical and mechanical works, modification works for the existing walkways, roads and drainage works, lighting works and landscaping works. The works are scheduled to commence in March 2024 and will take about 24 months to complete.

Walkway Covers connecting to Grantham Hospital at Wong Chuk Hang and Haven of Hope Hospital at Tseung Kwan O

The works mainly comprise: a. Construction of a walkway cover along the pedestrian walkway of Wong Chuk Hang Road with an approximate length of 250 metres connecting MTR Ocean Park Station and the existing footbridge no. HF42 which leads to Grantham Hospital; b. Construction of a walkway cover of an approximate length of 80 metres along the footpath of Ling Hong Road near the Haven of Hope Hospital; and c. Associated civil works, geotechnical works, electrical and mechanical works, roads and drainage works, lighting works, landscaping works and etc. The works are scheduled to commence in the first quarter of 2024 and will take about 20 months to complete.

Dualling of Hiram's Highway from Marina Cove to Sai Kung Town

The Contract mainly comprises design and construction of the following: i. widening of two sections of Hiram's Highway of approximately 3.5 kilometres (km) in total length between Marina Cove and Pak Sha Wan, and between Pak Sha Wan and Sai Kung Town from the existing single two-lane carriageway to a dual two-lane carriageway; ii. widening of the Pak Sha Wan section of Hiram's Highway of approximately 100 metres (m) in length from the existing single two-lane carriageway to a single four-lane carriageway; iii. widening of a section of Po Tung Road of approximately 400 m in length between Yau Ma Po Street and Fuk Man Road from the existing single two-lane carriageway to a dual two-lane carriageway; iv. improvement of a section of Po Tung Road and Tai Mong Tsai Road of approximately 600m in total length between Fuk Man Road and Wai Man Road to a single two-lane carriageway in accordance with current standards; v. a subway across Hiram's Highway with associated lifts in Pak Sha Wan; and vi. ancillary works including drainage and sewerage, waterworks, slope stabilisation, public lighting, noise barriers, landscaping works as well as other associated works. The works are scheduled to commence in the second quarter of 2024 and will take about 84 months to complete.

Highways Department Term Contract (Management and Maintenance of Roads in Sha Tin, Sai Kung and Islands Districts excluding Expressways and High Speed Roads 2024 – 2029)

This is a 5-year maintenance term contract from 1 April 2024 to 31 March 2029. The works mainly comprise the management and maintenance of public roads including associated slopes, highway structures, tunnels, landscaping and minor improvement works in Sha Tin, Sai Kung and Islands Districts excluding Expressways and High Speed Roads.

Highways Department Term Contract (Management and Maintenance of Roads in Kowloon East excluding Expressways and High Speed Roads 2024 – 2029)

This is a 5-year maintenance term contract from 1 April 2024 to 31 March 2029. The works mainly comprise the management and maintenance of public roads including associated slopes, highway structures, tunnels, landscaping and minor improvement works in Kowloon East excluding Expressways and High Speed Roads.

Structural Maintenance Works of Shenzhen Bay Bridge (Hong Kong Section), Contract 2

The works mainly include the replacement of external pre-stressing tendons at south bound of Shenzhen Bay Bridge (Hong Kong Section). The works are scheduled to commence in December 2023 and will take about 65 months to complete.

WSD

Water Supplies Department

Replacement of Two Filter Presses at Ma On Shan Water Treatment Works

To improve the reliability and operating efficiency of the dewatering plant

Supply of Liquid Scintillation Counting System and Accessories to the Water Supplies Department, goods shall be delivered and installed within eighteen (18) weeks from the contract date

The instrument is used for qualitative and quantitative analysis of radiological parameters in water samples.

Supply of Liquid Chromatographic System Equipped with Tandem Mass Spectrometer to the Water Supplies Department, goods shall be delivered and installed within fifteen (15) weeks from the contract date

The instrument is used for qualitative and quantitative analysis of trace organic parameters in water samples.

Provision of (1) Light Goods Vehicles in Highway Yellow Colour and (2) Light Goods Vehicles for Hiring by the Water Supplies Department

Provision of (1) Light Goods Vehicles in Highway Yellow Colour and (2) Light Goods Vehicles for Hiring by the Water Supplies Department for a period of 36 months commencing tentatively on 1 August 2024

Water Loss Investigation for Water Mains in New Territories East Region

Conduct leak detection work for the water mains within the Designated Area. The contract period is 12 months and the contract is scheduled to commence in March 2024.

Provision of Mechanical and Electrical Equipment for Remote Operation of Sham Tseng Water Treatment Works

The contract mainly comprises the supply and installation of mechanical and electrical equipment at Sham Tseng Water Treatment Works and Yau Kom Tau Water Treatment Works for remote operation purposes. The contract period is 930 days and the contract is scheduled to commence in May 2024.

Provision of Employment and Management Services for Supporting Staff to Customer Telephone Enquiry Centre of Water Supplies Department

Provision of Employment and Management Services for Supporting Staff to Customer Telephone Enquiry Centre of Water Supplies Department for a period of fourteen (14) months

Provision of Services for Enterprises Cherish Water Campaign of the Water Supplies Department

For use in the on-site chlorine generation (OSCG) plants at water treatment works (WTWs) in Hong Kong

TD

Transport Department

Detailed Site Survey for Outstation Equipment and Facilities of CCTV Cameras for the Transport Department

Agreement for Management, Operation and Maintenance of Kai Tak Tunnel and Lion Rock Tunnel

The successful tenderer will be required to undertake the following duties: (a) management and operation of the Tunnels, including: (i) management of the Tunnels (including taking enforcement actions under the applicable ordinances and regulations); (ii) collection of approved fees and charges; (iii) control and regulation of traffic; (iv) patrolling and security; (v) handling incidents occurred within the Tunnel Area; (vi) recovery and removal of broken down vehicles; and (vii) cleansing of the Tunnels; (b) operation and maintenance of the electrical and mechanical equipment and electronic systems of the Tunnels, including: (i) power supply system; (ii) lighting system; (iii) ventilation system; and (iv) traffic control and surveillance system; (c) providing non-structural maintenance and repairing works for the upkeep of the Tunnels; (d) providing landscape services for the horticulture and vegetation within the Tunnel Area; (e) selection and appointment of advertising agent(s) for displaying advertisements at approved locations within the Tunnel Area; and (f) working with the contractor of Improvement of Lion Rock Tunnel project (“the LRTI Project”) and performing preparatory activities for re-provisioning of the administration building for the construction of a new tunnel tube under the LRTI Project. The duration of the agreements shall be six (6) years commencing on 1 August 2024 or on the date(s) the Government of the Hong Kong Special Administrative Region shall specify by notice.

Supply and Delivery of Auxiliary Devices for Enhancing Pedestrian Safety at Signalised Pedestrian Crossings to the Transport Department

Supply and deliver red light casting auxiliary devices for enhancing pedestrian safety at signalised pedestrian crossings

Agreement for Management, Operation and Maintenance of Shing Mun Tunnels and Tseung Kwan O Tunnel

The successful tenderer will be required to undertake the following duties: (a) management and operation of the Tunnels, including: (i) management of the Tunnels (including taking enforcement actions under the applicable ordinances and regulations); (ii) collection of approved fees and charges; (iii) control and regulation of traffic; (iv) patrolling and security; (v) handling incidents occurred within the Tunnel Area; (vi) recovery and removal of broken down vehicles; and (vii) cleansing of the Tunnels; (b) operation and maintenance of the electrical and mechanical equipment and electronic systems of the Tunnels, including: (i) power supply system; (ii) lighting system; (iii) ventilation system; and (iv) traffic control and surveillance system; (c) providing non-structural maintenance and repairing works for the upkeep of the Tunnels; (d) providing landscape services and tree management for the horticulture and vegetation within the Tunnel Area; and (e) selection and appointment of advertising agent(s) for displaying advertisements at approved locations within the Tunnel Area. The duration of the agreements shall be six (6) years commencing on 1 June 2024 or on the date(s) the Government of the Hong Kong Special Administrative Region shall specify by notice.

EPD

Environmental Protection Department

A Licence to Operate Government-owned Electric Vehicle Chargers for Fee-paying Charging Service in Government Carparks (Batch 2)

A Licence to Operate Government-owned Electric Vehicle Chargers for Fee-paying Charging Service in Government Carparks (Batch 1)

EPD Term Contract for Minor Works at Restored Landfills (2023-2026)

Provision of Spatial Design Services for Recycling Stores in Public Rental Housing Estates

Study on Gaseous Air Pollutants Offshore Southeast China (from Zhejiang to Hong Kong)

West New Territories Landfill Extension

Municipal Solid Waste Charging: Provision of Warehouse and Logistics Coordination Services

The Pilot Scheme on Application of Reverse Vending Machines – Stage 3

Supply of Mobile Laboratory Shelters to the Environmental Protection Department

North Lantau Transfer Station and Outlying Islands Transfer Facilities Second Follow-On Contract

Provision of Services for Setting Up and Operation of Recycling Store at Tsing Yi Station

Provision of Services for Food Waste Smart Bin

Tenders are invited for the provision of services for Food Waste Smart Bin. The contract is scheduled to commence in Quarter 2 of 2024 (tentative) for a period of 47 months.

Provision of Agency Staff and Associated Transportation Services to Support Implementation of Municipal Solid Waste (MSW) Charging in Hong Kong

Tenders are invited for providing Agency Staff and Associated Transportation Services to Support Implementation of Municipal Solid Waste (MSW) Charging in Hong Kong. The contract is scheduled to commence in Quarter 2 of 2024 for a period of nine months.

Lease of Lots T2 and T3 in EcoPark for Waste Recycling Business

Invitation for 20-year lease of Lots T2 and T3 with an area of about 9,420m2 as shown in the annexed layout plan for waste electric vehicle (“EV”) rechargeable battery recycling business in EcoPark in Tuen Mun, New Territories.

MTR

MTR Corporation Limited

Replacement of Nabco Type PSD Power Supply System in TML and TKL

Civil and E&M Works for Provision of Integrated Wheelset Maintenance Centre

Enhancement Work for SP-Train In-Saloon CCTV System

Partial Replacement of 11kV Cables in Light Rail

Escalators

Toilet Renovation Works for Two International Finance Centre

Provision of Gate-Top PIDS for Strategic Stations in Heavy Rail Line

TME Stations, Viaducts and River Crossing

Trackwork and Overhead Line for Tung Chung Line Extension

Oyster Bay Station and Associated Works

Platform Screen Door and Automatic Platform Gate

Tunnel Environmental Control System for KTU(EAL)

Provision of Sanitary and Hygiene Products for Managed & Investment Properties and Administration Department

New Tuen Mun Swimming Pool

Provision of Robotic Air Condition Unit Wash Plants in HTD and TKD

C8950 & C8951 Provision of Re-Railing Wagons for DUAT Line Track Replacement

Power Supply System for Lantau Extension Projects

Term Contract for General Building Repair and Shop Repartitioning Works for Investment Properties (Package B)

Replacement of Passenger Lifts (A)

Provision of Preparation Works for Certificate of Roadworthiness (COR) Examination of MTR Buses

Supply of Accessible Buses

Maintenance Service for the Fallen Object Detection System in East Rail Line

Term Contract for General Building Repair and Shop Repartitioning Works for Investment Properties (Package A)

Civil and E&M Works for Replacement of Passenger Lifts (Batch 3A)

Signalling System for KTU(EAL)

K3507 - Partial Replacement of Hong Kong Police Force Radio Amplifier System for EAL & TML

Kwu Tung Station on East Rail Line

Procurement of 35 Double-decker Electric Buses

Provision of China Social Media Services & Online Advertising Services for MTR Malls

Maintenance Services of UTM at EAL, MOL, KTE, WIL and SIL

Provision of Laundry and Dry Cleaning Services for Managed and Investment Properties

Replacement of Trackside Advertising Panels on AT&D

Provision of Term Workers for Rolling Stock and Depot Works

Provision of DCS Network for 5G Services

Refurbishment of 11kV Service Transformers in AT&D (Phase 1)

No Tender Notices
HA

Housing Department

Construction of Public Housing Development at San Kwai Street, Kwai Chung and Alteration and Addition Works at Mei Tin Estate, Sha Tin

Foundation and Demolition for Public Housing Development at To Kwa Wan Road

Construction of Public Housing Development at Tai Wo Hau Road Phases 1 and 2

Construction of Public Housing Development at Wu Shan Road, Tuen Mun

Professional Services Provider Agreement for Body-shopping of Structural Engineers (2023 Package A)

Professional Services Provider Agreement for Body-shopping of Structural Engineers (2023 Package B)

Professional Services Provider Agreement for Body-shopping of Structural Engineers (2023 Package C)

Professional Services Provider Agreement for Body-shopping of Structural Engineers (2023 Package D)

Professional Services Provider Agreement for Body-shopping of Structural Engineers (2023 Package E)

Professional Services Provider Agreement for Body-shopping of Structural Engineers (2023 Package F)

Professional Services Provider Agreement for Body-shopping of Structural Engineers (2023 Package G)

Building Services Engineering Services for Public Housing Development at Long Bin Phases 2 & 3

Engineering Services on Structural and Geotechnical Design for Public Housing Development at Long Bin Phases 2 & 3

Architectural Services for Public Housing Development at Long Bin Phases 2 & 3

Engineering Services on Structural and Geotechnical Design for Public Housing Development at Tung Chung Area 23 Phase 1

Building Services Engineering Services for Public Housing Development at To Kwa Wan Road and Drainage Services for Public Housing Development at Tung Chung Area 23 Phase 1

Foundation and Demolition for Public Housing Development at Ching Hong Road North, Tsing Yi, Phase 3 and Advance Hoarding for Public Housing Development at Shap Pat Heung Road, Yuen Long

Foundation for Public Housing Development at Shek Li Street

Foundation, Site Formation, Roads and Drainage for Public Housing Development at Chung Nga Road West, Tai Po

Construction of Public Housing Development at Wah King Street, Pok Fu Lam South

Architectural Services for Public Housing Development at To Kwa Wan Road

Electrical Installation for Construction of Public Housing Development at Kwu Tung North Area 19 Phase 1A and Phase 1B

Foundation for Public Housing Redevelopment at Pak Tin Estate Phase 12, Sham Shui Po and Public Housing Development at Wah Lok Path, Pok Fu Lam South

Soft Landscape Works for Public Housing Development at Lai Cho Road, Kwai Chung

Architectural Services for Public Housing Development at Tung Chung Area 46

Engineering Services on Structural and Geotechnical Design for Public Housing Development at Tung Chung Area 46

Building Services Engineering Services for Public Housing Development at Tung Chung Area 46

Foundation for Public Housing Development at Kam Sheung Road Site 6 Phases 1 & 2

Building Services Engineering Services for Public Housing Development at Pak Shing Kok Road, Tseung Kwan O

Architectural Services for Public Housing Redevelopment at Pak Tin Estate Phase 12

Building Services Engineering Services for Public Housing Redevelopment at Pak Tin Estate Phase 12

Engineering Services on Structural and Geotechnical Design for Public Housing Redevelopment at Pak Tin Estate Phase 12

Foundation for Public Housing Development at Ying Yip Road, Tseung Kwan O

Engineering Services on Structural and Geotechnical Design for Public Housing Development at To Kwa Wan Road

Ground Investigation Term Contract A (2023-2025)

Ground Investigation Term Contract B (2023-2025)

Ground Investigation Term Contract C (2023-2025)

Ground Investigation Term Contract D (2023-2025)

Building Services Engineering Services for Public Housing Development at Kwai On Factory Estate and Drainage Services for Public Housing Development at Sui Fai Factory Estate

Electrical Installation for Construction of Public Housing Development at Tung Chung Area 103

Engineering Services on Structural and Geotechnical Design for Public Housing Development at Kwai On Factory Estate

Design and Construction of Public Housing Developments at Tuen Mun Area 54 Site 4A(South) and Site 5

Materials Testing Services Term Contract (2023/2025) for Non-Destructive Pile Testing for Foundation and Building Contracts (Package 1)

Materials Testing Services Term Contract (2023/2025) for Non-Destructive Pile Testing for Foundation and Building Contracts (Package 2)

Materials Testing Services Term Contract (2023/2025) for Non-Destructive Pile Testing for Foundation and Building Contracts (Package 3)

Supply, Delivery, Installation, Commissioning, Maintenance and Other Related Services of the Housing Authority Cloud Computing Infrastructure (HA-Cloud) Expansion for the Hong Kong Housing Authority

Foundation for Public Housing Development at Kam Sheung Road Site 1 Phases 1 & 2

Term Agreement for Engineering Surveying Services 2023-2025 for Region A

Term Agreement for Engineering Surveying Services 2023-2025 for Region B

Foundation for Public Housing Development at Wang Chau Site B, Yuen Long

Soft Landscape Works for Public Housing Development at Diamond Hill Phase 2

Engineering Services on Structural and Geotechnical Design for Public Housing Development at Wang Cheong Factory Estate

Architectural Services for Public Housing Development at Kai Lung Wan North, Pok Fu Lam South

Architectural Services for Public Housing Development at Kai Lung Wan South, Pok Fu Lam South

Building Services Engineering Services for Public Housing Development at Wang Cheong Factory Estate

Provision of Implementation Services for Operating System Upgrade and Related Configuration of File and Print Servers for the Hong Kong Housing Authority

Engineering Services on Structural and Geotechnical Design for Public Housing Development at Kai Lung Wan North, Pok Fu Lam South

Engineering Services on Structural and Geotechnical Design for Public Housing Development at Kai Lung Wan South, Pok Fu Lam South

Construction of Public Housing Development at Fanling North Area 15 East Phase 1

Provision of Software Installation Services for Autodesk AEC Collection Upgrade for the Hong Kong Housing Authority

Foundation for Public Housing Development at Tung Chung Area 42

Supply of 660-litre Plastic Rectangular Containers for Refuse Collection for the Hong Kong Housing Authority

Building Services Engineering Services for Public Housing Development at Kai Lung Wan South, Pok Fu Lam South

Building Services Engineering Services for Public Housing Development at Kai Lung Wan North, Pok Fu Lam South

Architectural Services for Public Housing Development at Wang Cheong Factory Estate

Design, Supply, Delivery, Installation, Commissioning, Maintenance and Other Related Services for Encryption Key Management Software Appliances of Housing Authority Cloud Computing Infrastructure (HA-Cloud) for the Hong Kong Housing Authority

Provision of Maintenance Services of Database Machine for the Hong Kong Housing Authority

Provision of Subscription and Other Related Services of Autodesk AEC Collection Named User Subscription Licences for the Hong Kong Housing Authority

Term Agreement of Professional Services for Factory Inspection of Precast Concrete Components Produced in Guangdong Province of China (2023-2025) (Package 1)

Term Agreement of Professional Services for Factory Inspection of Precast Concrete Components Produced in Guangdong Province of China (2023-2025) (Package 2)

Supply, Installation and Commissioning of 2000 kN Universal Testing Machine to Housing Department Materials Testing Laboratory

No Tender Notices